SAM Formula:
From: | To: |
SAM (Standard Allowed Minutes) is a key performance metric in the garment industry that measures the standard time required to complete a specific operation or garment. It's used for production planning, costing, and efficiency measurement.
The calculator uses the SAM formula:
Where:
Explanation: The formula combines all time elements to determine the standard time allowance for a specific garment operation.
Details: Accurate SAM calculation is crucial for production planning, cost estimation, efficiency measurement, and fair labor practices in the garment manufacturing industry.
Tips: Enter basic time, machine time, and allowance in minutes. All values must be non-negative numbers representing time components.
Q1: What is the difference between SAM and SMV?
A: SAM (Standard Allowed Minutes) and SMV (Standard Minute Value) are often used interchangeably in the garment industry to refer to the standard time required for an operation.
Q2: How is basic time determined?
A: Basic time is typically determined through time study observations and represents the average time taken by a qualified worker working at normal pace.
Q3: What factors affect allowance time?
A: Allowance includes time for fatigue, personal needs, machine maintenance, and other contingencies that may affect production time.
Q4: Why is SAM important for garment manufacturers?
A: SAM helps in accurate costing, production planning, efficiency measurement, and ensuring fair wages for workers based on performance.
Q5: Can SAM vary for the same operation?
A: Yes, SAM can vary based on fabric type, machine efficiency, operator skill level, and factory working conditions.